Strategic Mine Planning solutions for Open Pit Mines.
What plant size maximizes profit? What mine capacity is more efficient?
Net Present Value (NPV) represents the cash flow to which a discount rate is applied, set according to project risk level or profitability requirement.
The Strategic Mine Planning (SMP) issue of an open pit project is generally defined looking for NPV maximization by searching an optimized extraction sequence.
That sequence must respect operational restrictions such as slope angles, limits and drilling rates, as well as mineral mining and processing capacities.
By implementing GEOVIA WHITTLE and SIMULIA Isight solutions, it is possible to apply the Hill of Value concept, establish ranges of mining, processing and cut-off grade capacities, with the aim of increasing value and evaluate its robustness and reliability, against the range of design variables that were selected (Fig. 1).
about Strategic Mine Planning solutions for Open Pit Mines from GEOVIA.
AUTHORS:
Cristian J. Poblete
María A. González
Joaquín A. Romero
Daniel L. Fuentes
Maria Angelica Gonzalez
María-Angélica is a Mining Engineer with a Diploma in Geostatistics and she is a candidate for a Master of Science mention Geology. She is registered as a Competent Person with the Qualification Commission of Competencies in Resources and Mining Reserves of Chile.
She started her professional career in 1999 and has worked in consulting and project operations for diverse types of mineral deposits, performing the geostatistical evaluation of elements of economic interest as well as geometallurgical and contaminant variables.
She is experienced in metallic and non-metallic projects, such as copper, gold, silver, molybdenum, iron, zinc, lead, titanium sands, phosphates, carbonates, iodine and nitrates, both in America and in Africa.
Her current position is Senior Services Manager of Dassault Systèmes Chile (GEOVIA), serving the Mining Industry in Latin America. She is in charge of both consulting and training as well as technical sales, mainly in the technical and administrative leadership of projects. Previously, she worked as Leader of Geology and Resources of the Consulting Group at AMEC. AMEC International Ingeniería y Construcción.