July 1, 2019

Checking linear clearance around existing and planned drillholes in Surpac

  For roles such as an Underground Geologist, Underground Planning Engineer or…
header
Avatar Kim Ferguson-Thomas

For roles such as an Underground Geologist, Underground Planning Engineer or an Underground Surveyor, it is necessary to be able to view planned underground workings with existing drill holes and to view planned drill holes with existing workings.

This capability helps ensure the safety of both underground miners and workers on the surface who are operating within the area of influence from the dangers associated around drillholes in the areas of influence.

Typical dangers could include:

  • Inrush of water down the drill holes into the underground workings
  • Drilling into active drives where boggers and jumbos are working
  • Air blast up the drill holes during underground firings, or
  • Air blast down the drill holes during open pit firings

To view workings subject to exiting and planned drillholes:

1. Open up the drillhole database and display the drillholes.

2. Open up the design solids.

Stay up to date

Receive monthly updates on content you won’t want to miss

Subscribe

Register here to receive a monthly update on our newest content.