Infrastructure, Energy & MaterialsJuly 25, 2024

Designing the Future of Infrastructure

header
Avatar Victoria Martinez

In the rapidly evolving world of infrastructure, the design phase plays a pivotal role in determining the success of a project. From the initial concept to the final blueprint, every detail must be meticulously planned to ensure efficiency, sustainability, and longevity. Understanding the complexities and necessities of modern infrastructure design is crucial for achieving these goals.

The Importance of Early Planning
Early planning in the design process is essential. Project owners must anticipate challenges that could occur at every stage to save time and reduce production and lifecycle costs. This proactive approach involves digitalizing the entire project on an integrated platform to achieve end-to-end visibility right from the start. Such digitalization helps in identifying potential challenges early, fostering better communication among stakeholders, and ensuring that infrastructure quality does not suffer due to lifecycle cost reduction efforts.

Leveraging Collaborative Platforms
A collaborative approach to infrastructure design is necessary to overcome the inefficiencies and increased costs associated with traditional construction methods. Collaborative delivery methods, such as integrated project delivery (IPD) and collaborative contracting, are becoming the norm. By aligning people, systems, business structures, and practices into a single process, stakeholders can significantly improve their collaborative efforts across all project stages.

Advanced platforms like 3DEXPERIENCE® offer a single, secure environment where stakeholders can share information, model assets as virtual twins, and track project progress in real time. This integrated approach not only breaks down information silos but also enhances the overall efficiency and effectiveness of the project delivery process.

Sustainability and Lifecycle Cost Reduction
Sustainability is a critical driver in modern infrastructure design. As the world transitions to a more sustainable economy with net-zero targets, project stakeholders must adopt practices that prioritize environmental friendliness. Establishing a clear methodology to measure, evaluate, and improve key sustainability performance metrics is essential.

In addition to sustainability, there is an increasing focus on lifecycle cost reduction. Typically, operation accounts for approximately 80% of a project’s lifecycle cost, leaving only 20% to planning, design, and construction. By spending more on the design phase, stakeholders can potentially save exponentially more in the later stages of the project. This shift in focus from initial costs to lifecycle costs requires a strategic approach, leveraging advanced digital tools and methodologies to ensure long-term savings and efficiency.

Overcoming Labor Shortages with Technology
The construction industry faces a significant challenge due to the shortage of skilled labor. With many seasoned workers retiring and a deficit of young skilled workers entering the industry, the existing workforce is overstretched, leading to delays and increased costs. Optimizing collaboration and leveraging advanced technologies can address this issue effectively.

Platforms like 3DEXPERIENCE®, with their virtual twin capabilities, allow for better planning and management of construction processes. Contractors can simulate construction outcomes, plan tasks, and labor ahead of time, and ensure worker safety through predictive analysis. This not only improves efficiency but also makes the construction process more attractive to the younger workforce, addressing the labor shortage issue at its root.

Enhancing the Construction and Maintenance Phases
The construction phase is crucial for realizing the design vision. By accessing live data insights on an integrated platform, stakeholders can perform virtual twin-based predictive analysis before construction begins. This foresight helps avoid unnecessary costs, material waste, and on-site accidents, ensuring that the project is completed efficiently and sustainably.

Maintenance and operation are equally important. Outdated assets are a significant hindrance to progress during these phases. Single-source data models provide up-to-date information and eliminate reliance on guesswork. This ensures that maintenance activities are carried out effectively, prolonging the lifespan of the infrastructure and reducing overall costs.

A Path Forward for Modern Infrastructure Design
A comprehensive, collaborative approach to infrastructure design is essential for modern projects. By leveraging advanced digital platforms like 3DEXPERIENCE®, stakeholders can enhance planning, improve sustainability, reduce lifecycle costs, and address labor shortages. Ultimately, this integrated approach ensures that infrastructure projects are not only successful but also sustainable and efficient, paving the way for a better future.

For more information on how to optimize your infrastructure projects, explore the transformative capabilities of advanced digital platforms and collaborative methodologies.