January 15, 2020

Introducing MineSched 2020

Discover MineSched 2020 with a fresh new user interface and POWER´BY capabilities…
header
Avatar GEOVIA
Discover MineSched 2020 with a fresh new user interface and POWER´BY capabilities

GEOVIA MineSched 2020 presents a fresh new user interface, introduces the ability to publish results to the 3DEXPERIENCE platform with MineSched POWER’BY, and provides the new ability to update the starting point of all development and production activities for underground workflows and more.

MINESCHED POWER´BY

You can now upload the results of a MineSched schedule to the 3DEXPERIENCE platform to analyze and share the schedule data. With report authoring and analytics, users can gain insights and knowledge about the tactical schedule. More importantly, with dash-boarding and collaboration, you can share those insights and knowledge with other stakeholders.

DEVELOPMENT PROGRESS TRACKING

Quickly and easily update the starting position of the schedule based on survey results and development reports with the new Development Progress Tracking tab.

INTEGRATION OF SURPAC STOPE SHAPE OPTIMIZER

Mining Locations created as part of the Surpac Stope Shape Optimizer (SSO) can now be directly imported into MineSched via the SDM Model process. To enable this workflow, a new Locations type option has been added to the Location Grouping workflow, and the option to select Stopes is available.

PRODUCTION PROGRESS TRACKING

Quickly and easily update the starting position of the schedule based on survey results and production reports with the new Production Progress Tracking.

USER INTERFACE

On the new MineSched user interface, you can use the ribbon to access the tabs and the commands. In the Ribbon display options list on the title bar.

OTHER ENHANCEMENTS

Additional enhancements or defect fixes that improve work performance include:

• Changes to Location names in Spreadsheet View.

• Changes to Material Movement rules while performing stockpile blending calculations.

• Performance improvements while using the Evaluate Headings process.

• Replace the Spreadsheet tools with a more modern solution.

NEW FEATURE VIDEOS: GEOVIA MINESCHED 2020

DEVELOPMENT PROGRESS TRACKING

Stay up to date

Receive monthly updates on content you won’t want to miss

Subscribe

Register here to receive updates featuring our newest content.